Third meeting of the JCOMM Observations Programme Area Coordination Group

09 - 11 March 2009,

Intergovernmental Oceanographic Commission of UNESCO
1 rue Miollis

75015 Paris
France

Annotated Agenda

1 Opening
2 Requirements for the Observations Programme Area (OPA)
2.1 Quick review of scientific requirements for climate, GCOS progress and update
2.2 Critical review of non-climate requirements and feasibility (Statements of Guidance as part of CBS rolling review, including SPA requirements)
2.3 Coordination and integration issues from the JCOMM Data Management Programme Area (DMPA)
2.4 Coordination and integration issues from the JCOMM Services Programm Area (SPA)
3 Review of status and challenges for each observing system component
3.1 JCOMM Ship Observations Team (SOT)
3.2 JCOMM Data Buoy Cooperation Program (DBCP)
3.3 JCOMM Global Sea Level Observing System (GLOSS)
3.4 Argo
3.5 OceanSITES
3.6 International Ocean Carbon Coordination Program (IOCCP)
3.7 Satellites
4 Issues and synergies for cross-component integration and coordination
4.1 JCOMM OPA metrics
4.2 Are rquirements being met?
4.3 Instrument best practics and standards (contribution to WIGOS pilot project, JCOMM Catalogue)
4.4 Common capacity-building requirements and how to effectively implement the PANGEA concept
4.5 Common strategy to move forward including cross-coordination and synergies
5 Technical coordination
5.1 Status of JCOMMOPS
5.2 JCOMM OPA Network Status Reporting, including JCOMMOPS and the Observing System Monitoring Center (OSMC)
5.3 Report from the secretariat on process for Observing Program Support Centre (OPSC) expansion
5.4 Guidance from the Observing Networks
6 OceanObs'09
6.1 Status of planning for OceanObs'09
6.2 Review of the Community White Papers from the OPA
6.3 Identification of the common issues to be raised in Plenary Papers
7 JCOMM-III and parent body (WMO + IOC) reporting and recommendations
7.1 What needs to be raised at the cross-programme area technical level?
7.2 What needs to be raised at the intergovernmental level?
7.3 OPA Draft operating plan
8 Closing