Intergovernmental Oceanographic Commission of UNESCO
1 rue Miollis
75015 Paris
France
1 | Opening |
2 | Requirements for the Observations Programme Area (OPA) |
2.1 | Quick review of scientific requirements for climate, GCOS progress and update |
2.2 | Critical review of non-climate requirements and feasibility (Statements of Guidance as part of CBS rolling review, including SPA requirements) |
2.3 | Coordination and integration issues from the JCOMM Data Management Programme Area (DMPA) |
2.4 | Coordination and integration issues from the JCOMM Services Programm Area (SPA) |
3 | Review of status and challenges for each observing system component |
3.1 | JCOMM Ship Observations Team (SOT) |
3.2 | JCOMM Data Buoy Cooperation Program (DBCP) |
3.3 | JCOMM Global Sea Level Observing System (GLOSS) |
3.4 | Argo |
3.5 | OceanSITES |
3.6 | International Ocean Carbon Coordination Program (IOCCP) |
3.7 | Satellites |
4 | Issues and synergies for cross-component integration and coordination |
4.1 | JCOMM OPA metrics |
4.2 | Are rquirements being met? |
4.3 | Instrument best practics and standards (contribution to WIGOS pilot project, JCOMM Catalogue) |
4.4 | Common capacity-building requirements and how to effectively implement the PANGEA concept |
4.5 | Common strategy to move forward including cross-coordination and synergies |
5 | Technical coordination |
5.1 | Status of JCOMMOPS |
5.2 | JCOMM OPA Network Status Reporting, including JCOMMOPS and the Observing System Monitoring Center (OSMC) |
5.3 | Report from the secretariat on process for Observing Program Support Centre (OPSC) expansion |
5.4 | Guidance from the Observing Networks |
6 | OceanObs'09 |
6.1 | Status of planning for OceanObs'09 |
6.2 | Review of the Community White Papers from the OPA |
6.3 | Identification of the common issues to be raised in Plenary Papers |
7 | JCOMM-III and parent body (WMO + IOC) reporting and recommendations |
7.1 | What needs to be raised at the cross-programme area technical level? |
7.2 | What needs to be raised at the intergovernmental level? |
7.3 | OPA Draft operating plan |
8 | Closing |