GSSC-XII/4.2

DBCP-ETWS Pilot Project on Wave measurement Evaluation and Test from moored buoys – (DBCP-ETWS PP-WET)

Summary JCOMM Technical Workshop on Wave Measurements from Buoys 2 - 3 October 2008, New York, United States
Doc Type Information Document
Status Draft
Notes PROPOSAL FOR PILOT PROJECT
This document is used in the event(s): 12th Session of GOOS Scientific Steering Committee Meeting

Group(s): GOOS
Created at 17:40 on 09 Feb 2009 by Thomas Gross
Updated at 17:19 on 28 Apr 2009 by Thomas Gross